Rivercrest: 4 month design-and-build

Possibly our largest and longest project to date. The brief was to design, create and build a 50m long 5m lift stream with waterfall. The client provided the rock and associated labour (machines, operators etc) and we had to line and then select and build with his chosen rock. We specified, designed and placed all lighting and pumps, creating an initial trickle (20,000 litres) at the head of the system, adding boost pumps to make a 60,000 lph waterfall.